Trending

News

  • 0
  • 0

Construction Precautions for Foam Lightweight Soil

If you are looking for high-quality products, please feel free to contact us and send an inquiry, email: brad@ihpa.net



The Biden administration plans to ease sanctions on Venezuelan oil to allow more of the country's crude to reach Europe.  

The U.S. will allow European companies still operating in Venezuela to immediately transfer more oil to the continent, while allowing Chevron to negotiate a resumption of operations in Venezuela, according to people familiar with the matter.  Venezuela's OPPOSITION, which is backed by the United States, is understood to favor the move.  Tight global oil supplies have sent crude and fuel costs soaring, threatening to add to already high inflation.  Increasing Venezuelan crude exports would help ease supply constraints while also helping to reduce Europe's dependence on Russian energy.

The US has sought to encourage talks between the Venezuelan government and the US-backed opposition to open the way to free and fair elections by extending a limited license held by Chevron to allow the oil company to maintain its operations in Venezuela and negotiate future operations.  

The United States reportedly did not extend a permit to Allow Chevron to drill and sell Venezuelan crude, as the company had hoped.  

The license extension will allow Chevron to negotiate with State-run Petroleos de Venezuela SA, with which it has a joint venture.  Previously, the company could not directly negotiate with any officials sanctioned by the United States.  Chevron has been lobbying the United States to allow it to drill for Venezuelan crude and sell it on world markets to help lower energy prices amid the Russia-Ukraine war.

Affected by the ever-changing international situation, the supply and prices of many commodities like the Foam Lightweight are still very uncertain.


The filling elevation of the foam light soil with different strengths shall be constructed in strict accordance with the design requirements. The anti-seepage geomembrane on the top of the foam light soil subgrade shall be laid under the metal mesh, and the lap joint shall be thermally welded, and the lap width shall not be less than 10cm. 

When laying, it should be flattened and tightened to avoid local rolling up. If necessary, U-shaped nails can be used for anchoring. When laying the metal mesh, U-shaped nails should be used for anchoring, the longitudinal anchorage spacing is 2m, and the transverse anchorage spacing is 1.0m. The plane position of the metal mesh should be overlapped and overlapped, the width of the overlap should not be less than 5cm, and the overlap should be bound with plastic buckles and anchored with U-shaped nails.


Before the light soil is poured, according to the boundary conditions of the construction site, the pouring area and the pouring layer are first divided, and the base is checked to ensure that the base is free of debris and water, and that the base elevation meets the design requirements and should meet the following requirements:

1) The top surface area of a single pouring area should not exceed 400m2.

2) The length in the long axis direction of a single pouring area should not exceed 20m.

3) 1.8cm thick wooden plywood is used to support the spacing and joints in the adjacent pouring area. The wooden plywood is a temporary support template and is also used as a deformation joint filling and must not be removed.

4) The thickness of the single-layer pouring layer should be controlled within the range of 0.3-1.0m.

5) The thickness of 0.8m at the top of the light soil subgrade must be used as an independent single-layer pouring layer, and the layer should be poured at one time in each pouring area.


Construction Control Points

1) For the adjacent pouring layers in the same section, when the temperature during the construction period is not lower than 15℃, the shortest pouring interval can be controlled by 8 hours; otherwise, the pouring interval should not be less than 12 hours.

2) The pouring construction time of the pouring layer in a single pouring area of foam light soil should be controlled within 2 hours.

3) It should be poured from one end to the other end along the long axis of the pouring area; if more than one pouring pipe is used for pouring, it can be poured side by side from one end, or the diagonal pouring method can be used.

4) During the pouring process, when the pouring pipe needs to be moved, it should be moved back and forth along the direction in which the pouring pipe is placed, and it is not appropriate to move the pouring pipe left and right; Move to the soil surface.

5) During the pouring process, the discharge port of the pouring pipe should be placed below the current pouring surface as much as possible; in other cases such as the surface being smoothed, the distance between the discharge port of the pouring pipe and the current pouring surface should not be higher than 1.5m.

Care and Maintenance

After the top surface of the light soil pouring area is poured to the design elevation, the surface should be covered with plastic film to moisturise and maintain the light soil roadbed; or non-woven geotextile covering and watering should be used for maintenance. The curing time is not less than 7 days. 

Before the top of the light soil subgrade is filled with soil, it is strictly forbidden to drive construction machinery on it; if it is unavoidable in some areas, a temporary protective layer with a thickness of not less than 50cm should be laid at a suitable position or covered with steel plates as a temporary access road for Construction machinery travels.


Connection with other processes

The top improved soil must be constructed when the maintenance strength of the light soil under the same conditions reaches 1.5MPa. During construction, it is strictly forbidden for large machinery such as dump trucks, road rollers, and bulldozers to directly walk on the top surface of the light soil. Paving and rolling are carried out in the forward way of leveling and rolling, that is, unloading trucks and road rollers should unload and walk at the rear end of the leveling machine.


During the rainy season, special measures should be taken to prevent and drain the water and soil, especially to prevent water and soil loss. Measures such as film covering and setting of temporary drainage ditches should be adopted to avoid slope erosion and prevent a large amount of water and soil from flowing to the lower light soil pouring surface for pollution. Light soil.


TRUNNANO is a concrete additives supplier with over 12 years experience in nano-building energy conservation and nanotechnology development. We accept payment via Credit Card, T/T, West Union and Paypal. Trunnano will ship the goods to customers overseas through FedEx, DHL, by air, or by sea.

If you are looking for high quality foaming agent, please feel free to contact us and send an inquiry.

sales@cabr-concrete.com


Cancer cells can "stretch out a big hand" and take away the mitochondria of immune cells. The Harvard Medical School research team cultured mouse and human breast cancer cells and immune cells, such as killer T cells, and used field emission scanning electron microscopy (FESEM) to observe the relationship between cancer cells and immune cells. interactive. Interestingly, they found that cancer cells stick out long nanotubes, typically within 100-1000 nanometers in diameter, each of which connects to multiple immune cells along the way. The researchers used the drug L-778123, which inhibits the formation of nanotubes, for treatment. The higher the concentration of L-778123, the better the treatment effect.

It is used in various high-tech fields, so the market demand for Foam Lightweight will continue to rise. We are a quality supplier of Foam Lightweight, please feel free to contact us.

Inquiry us

Copper Forgings: Definition, Characteristics and Key Issues in the Production Process

High Purity Germanium Sulfide GeS2 Powder CAS 12025-34-2, 99.99%

Metal Alloy 8.92g/Cm3 High Purity Polished Copper Plate

High Purity Nano Hafnium Hf powder CAS 7440-58-6, 99%

Metal Alloy 18g/cm3 High Density Tungsten Alloy Ball

Metal Alloy 18.5g/cm3 Polished Tungsten Heavy Alloy Plate

High Purity Molybdenum Boride MoB2 Powder CAS 12006-99-4, 99%

Metal Alloy High Density Tungsten Alloy Rod Grind Surface Tungsten Alloy Bar

High Purity Titanium Sulfide TiS2 Powder CAS 2039-13-3, 99.99%

High Purity Tungsten Silicide WSi2 Powder CAS 12039-88-2, 99%

High Purity Nano Ag Silver powder cas 7440-22-4, 99%

High Purity Chromium Diboride CrB2 Powder CAS 12007-16-8, 99%

High Purity 3D Printing Powder 15-5 Stainless Steel Powder

High Purity Silicon Sulfide SiS2 Powder CAS 13759-10-9, 99.99%

Supply Magnesium Granules Mg Granules 99.95%

High Purity Calcium Nitride Ca3N2 Powder CAS 12013-82-0, 99.5%

High Purity Colloidal Silver Nano Silver Solution CAS 7440-22-4

High Purity Zirconium Nitride ZrN Powder CAS 25658-42-8, 99.5%

High Purity 3D Printing 304 Stainless Steel Powder

Chromium Sulfide Cr2S3 Powder CAS 12018-22-3, 99.99%

Our Latest Products

Copper Forgings: Definition, Characteristics and Key Issues in the Production Process

Copper forgings are forged products made of copper alloy. Due to its excellent electrical conductivity, thermal conductivity, corrosion resistance and accessible processing properties, copper forgings are widely used in many fields such as electrical…

High Purity Germanium Sulfide GeS2 Powder CAS 12025-34-2, 99.99%

Germanium Sulfide (GeS2) is a semiconductor compound with the chemical Formula GeS2. It is easily soluble when heated alkali is used, but not in water.Particle size: 100mesh Purity: 99.99% About Germanium Sulfide (GeS2) Powder: Germanium Sulfide…

Metal Alloy 8.92g/Cm3 High Purity Polished Copper Plate

Copper products have good electrical conductivity, thermal conductivity, ductility, corrosion resistance, and wear resistance. They are widely used in electricity, electronics, energy, petrochemical industry. About Metal Alloy 8.92g/Cm3 High Purity…